Clearwater Reclaimed Water Distribution Systems Design, Pinellas County, Florida

Owner: City of Clearwater

The project consisted of providing subsurface soil conditions along a grid of proposed pipeline alignment that totals approximately 10 miles in length.  The proposed reclaimed water line will be located in two (2) areas within Clearwater, Florida.  The North Region area, also named Chautauqua, will consist of approximately 23,500 feet of 4 to 6-inch diameter distribution line and 3,500 feet of 12-inch diameter force main.  The Chautauqua area is located west of CR 611 and south of SR 580.  The South Region, also known as Coachman Ridge, will consist of approximately 22,000 feet of 4 to 6-inch diameter distribution line and 6,000 feet of 12-inch diameter force main.  The Coachmen Ridge area is located west of US 19 and south of CR 576.  The pipeline is anticipated to be installed via directional drilling methods.

Tierra provided subsurface soil conditions and relevant geotechnical engineering properties as well as geotechnical recommendations to guide project design and construction.