813.989.1354 (Tampa)     407.877.1354 (Winter Garden)     850.462.8774 (Pensacola)

Project: East-West Connector

East-West Connector, Polk County, Florida Owner: City of Lakeland Tierra is providing geotechnical engineering services for the proposed East-West Road (aka Edgewood Drive Extension as part of the Kimmins Contracting Design/Build Team.  The project includes the design...

Project: Citrus Park Drive Extension

Citrus Park Drive Extension, Hillsborough County, Florida Owner: Hillsborough County The project consisted of creating design and construction plans for improvements to and the extension of the existing Citrus Park Drive from Countryway Boulevard to Sheldon Road,...

Project: Mid-Bay Bridge Connector Phases II and III

Mid-Bay Bridge Connector Phases II and III, Okaloosa County, Florida Owner: Mid-Bay Bridge Authority The Mid-Bay Bridge is a 3.6 mile, two (2)-lane toll bridge spanning the Choctawhatchee Bay, in Okaloosa County. The existing bridge begins in Niceville, Florida and...

Project: Suncoast Parkway 2 (SR 589)

Suncoast Parkway 2 (SR 589), from North of US 98 to US 19/98 Hernando and Citrus Counties, Florida Owner: Florida’s Turnpike Enterprise Florida’s Turnpike Enterprise proposes to extend the existing Suncoast Parkway (Suncoast 1) northward from its existing...
Project: I-4 / Crosstown Connector

Project: I-4 / Crosstown Connector

I-4 / Crosstown Connector Segment 3C, Hillsborough County, Florida Owner: FDOT District VII Florida Department of Transporation District VII designed an elevated limited-access, freeway-freeway system Interchange that extended from Lee Roy Selmon Crosstown Expressway...